Underground Storage Tank Removal in Westville, IN

If you own or operate a commercial property in Westville with an underground storage tank (UST), removal usually comes up at a specific moment: a sale or refinancing, a redevelopment plan, a tank that is out of service, or a question from a lender. Aegis Environmental serves clients throughout Indiana, and its Michigan City office is the closest Aegis office to Westville. Aegis has served clients for more than 25 years.
Tank removal is regulated work. How the tank is closed, what samples are collected, and what the report-related documents include.
Why UST Removal in Westville Needs a Plan
Many commercial tanks in the Westville area serve fuel stops, fleet yards, and service properties along US 6 and US 421. Some are decades old, some sit unused, and some have incomplete records. Each changes the scope.
The right approach depends on the tank, its use, the site, and the rules that apply. Removal is one closure path, and it is not required in every case.
UST Removal Services for Westville Properties
Aegis provides turnkey operations for UST and aboveground storage tank (AST) services and has performed hundreds of tank closures. Depending on the tank and the site, UST removal and management services may include:
- Preliminary investigation and remediation planning
- Regulatory notifications before work begins
- Tank removal, closure, decommissioning, and cleaning
- Soil and groundwater sampling and analysis
- Report preparation and regulatory submittals
- Remediation and interim corrective action when site conditions call for it
- Demolition services
For tanks that will stay in service, Aegis also offers UST compliance and testing support. Aegis handles tank projects elsewhere in northwest Indiana as well, including UST removal in Valparaiso.
How a Westville UST Removal Project Typically Moves Forward
Aegis emphasizes the health and safety of its employees, subcontractors, clients, and others on the job site. Staff receive extensive health and safety training. A typical project follows these steps.
- Records and site review. Aegis locates the tank, piping, and any dispensers and gathers the available tank records.
- Notifications. Aegis prepares the regulatory notifications that apply to the tank before field work starts.
- Removal or closure. The tank is emptied, cleaned, and removed or closed in accordance with applicable EPA, state, API, NFPA, and OSHA requirements or guidance.
- Sampling. Soil samples, and groundwater samples where needed, are collected from the tank area and piping runs to document conditions.
- Reporting. Aegis prepares a report of the investigation, closure, and sampling work and supports the submittal. Agency review and approval are outside Aegis’s control.
If sampling shows a release, the project may move into further investigation and remediation. Aegis can scope that work through its Phase II investigation and remediation services, based on what the data show.
Speak with an Aegis project manager about the next appropriate step for your site.
Reimbursement and Cost Questions
Cost depends on the number and size of tanks, site access, what sampling shows, and whether corrective action is needed. Aegis can assist clients with applications for reimbursement of corrective-action expenditures from applicable state funds. Eligibility, payment, and approval rest with the state program.
For background on how the process works, read how Indiana state reimbursement funds apply to UST cleanup.
Request project-specific pricing from Aegis.
Aegis also provides selected residential environmental services, including heating-oil tank closure for homeowners.
FREQUENTLY ASKED QUESTIONS
Does every underground storage tank have to be removed?
No. Closure requirements depend on the tank, its use, its location, and the rules that apply. Some tanks may be closed in place. Aegis can help you evaluate the options for your site before work begins.
What happens if contamination is found during removal?
The findings are documented and reported as required, and the project may need further investigation or corrective action. Aegis can help plan the next step and assist with reimbursement applications where a state fund may apply.
How long does a tank removal take?
Timing depends on the number and size of tanks, site access, notification requirements, and sampling results. Talk with Aegis about your schedule so a project manager can evaluate the project requirements.
We are buying a Westville property with a tank. Where do we start?
Many buyers start with a Phase I environmental site assessment (Phase I ESA). The purpose of a Phase I ESA is to identify Recognized Environmental Conditions (RECs) in connection with a property. If a Phase I ESA identifies a REC, Aegis can help evaluate whether a Phase II investigation is warranted.